• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Ripper Tilt Cylinder Assemblies.
Figure 1. Ripper Frame Support.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  864    865    866    867    868  869  870    871    872    873    874  
img
. . . . . . . . . . . . . . . .
8
TM 5-2410-241-23-3
0279
FIELD MAINTENANCE INSTRUCTIONS
-
RIPPER FRAME ASSEMBLY SERVICE
0279
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0295
0
(WP 0302, Item 65)
Personnel Required
0
0
Handle, Sliding T, 3/4" Drive,
Two
17" Long (S0375) (WP 0302, Item 68)
0
0
Lifting Link (1/2 in.; 4,000 lb [1,800 kg])
Equipment Condition
0
(WP 0302, Item 36)
0
Machine parked (TM 5-2410-241-10)
0
Socket, Impact, 3/4" Drive, 6 pt
Ripper tilt cylinders removed (WP 0278)
46 mm (S0694) (WP 0302, Item 68)
0
0
Ripper carriage removed ( WP 0282)
Stand Assembly, Jack Stand
0
Ripper lift cylinders removed (WP 0277)
(WP 0302, Item 56)
0
0
Bottom guards removed (WP 0199)
Universal Drive, 3/4" Drive
0
(WP 0302, Item 70)
Drawings Required
0
0
Wrench, Combination 1-13/16" (S0797)
TM 5-2410-241-24P, Figure 147
(WP 0302, Item 68)
0
0
Estimated Time to Complete
Wrench, Electric Impact, 3/4" Drive,
0
1200 lb-ft (S0730) (WP 0302, Item 68)
1.1 Hr
0
0
Lifting Device (5,000 lb capacity)
0
Materials/Parts
0
Rag, Wiping (WP 0303, Item 24)
0
Bolt, 36 mm (2)
0
0279-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.