• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 2. Engine Troubleshooting with Codes - Continued.
Table 2. Engine Troubleshooting with Codes - Continued.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  434    435    436    437    438  439  440    441    442    443    444  
img
. . . . . . .
TM 5-2410-240-23-1
0019
Table 2. Engine Troubleshooting with Codes - Continued.
0019
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
2417-05 Ether Injection Control Sole- 7. Install jumper wire between
noid Current Below Normal Code
ether valve solenoid harness
Continued
connector EN-C20 (WP 0018,
Figure 136) terminal 1 and ter-
minal 2.
8. Turn ignition switch to ON
position (TM 5-2410-240-10).
9. Perform Ether Injection Sole-
2417-05 Remains Active - Pro-
noid Override Test (WP 0021)
ceed to Test Step 3.
and check if diagnostic code
2417-06 Becomes Active - Ether
2417-06 becomes active.
injection solenoid faulty. Replace
ether injection solenoid
(WP 0048).
Remove jumper wire from EN-C20
(WP 0018, Figure 136) terminal 1
and terminal 2.
Connect EN-C20 (WP 0018,
Figure 136) to ether valve sole-
noid.
Verify proper operation of machine
(TM 5-2410-240-10).
Test Step 3: Fuel Wiring Har-
ness Test.
1. Turn ignition switch and bat-
tery disconnect switch to OFF
position (TM 5-2410-240-10).
2. Remove jumper wire from
ether valve solenoid harness
connector EN-C20 (WP 0018,
Figure 136) terminal 1 and
ground.
3. Install jumper wire between
ether valve solenoid harness
connector EN-C20 (WP 0018,
Figure 136) terminal 1 and ter-
minal 2.
4. Disconnect harness connec-
tor EN-C13 (WP 0018, Figure
130) from engine ECM J1.
0019-120


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.