• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Front Seal and Protector.
STARTER MOTOR REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  466    467    468    469    470  471  472    473    474    475    476  
img
. . .
TM 5-2410-240-23-2
0094
FOLLOW-ON TASKS
00094
1. Install vibration damper and crankshaft pulley on engine (WP 0093).
2. Install front bottom guard (WP 0156).
3. Check and fill all fluid levels (WP 0037).
4. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0094-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.