10
TM 5-2410-240-23-2
FIELD MAINTENANCE
-
TRACK ADJUSTER AND SPRING ASSEMBLY SERVICE
0
117
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Tools and Special Tools
Personnel Required
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0289, Item 51)
0
References
0
Sling, Nylon (S0209)
WP 0282
(WP 0289, Item 40)
0
0
Hammer, hand, soft face, deadblow 52 oz
Equipment Conditions
0
(WP 0289, Item 53)
0
Machine parked (TM 5-2410-240-10)
Goggles (S0209)
0
Track separated and positioned aside
(WP 0289, Item 53)
0
Wrench, Torque, Click, Ratcheting,
0
Front and middle track roller cover removed
1/2" Drive, 250 lb-ft (WP 0289, Item 57)
0
Lifting device (1,000-lb capacity)
0
0
Drawings Required
Materials/Parts
0
0
TM 5-2410-240-24P, Figure 54
Rag, wiping (WP 0290, Item 21)
0
0
Backup ring (8)
Estimated Time to Complete
0
0
Lip seal
0
4.0 Hr
0
O-ring (6)
0
0117-1