• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Engine Ground Cable.
Figure 7. Arctic Kit Negative Battery Cable.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  942    943    944    945    946  947  948    949    950    951    952  
img
. .
TM 5-2410-241-23-1
0029
TEST STEP 1: GROUND CABLES CONTINUED
11. Remove cover (Figure 6, Item 1) from NATO slave receptacle (Figure 6, Item 3).
12. Using a digital multimeter (WP 0296), measure voltage between positive post (Figure 1, Item 1) of battery and
outer contact (Figure 6, Item 2) (negative side) of NATO slave receptacle (Figure 6, Item 3). Voltage drop
should be within 1 volt of value recorded in step 3 or the NATO slave receptacle ground cable is faulty.
a. If voltage drop is greater than 1 volt of value recorded in step 3, NATO slave receptacle ground cable is
faulty. Replace NATO slave receptacle ground cable (WP 0045).
b. If voltage drop is within 1 volt of value recorded in step 3, install NATO slave receptacle cover (Figure 6,
Item 1) and proceed to step 13.
Figure 6. Negative Contact of NATO Slave Receptacle.
0029
0029-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.