• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Brake Switch Harness Grommet.
Figure 10. Instrument Panel Upper Bolts.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1004    1005    1006    1007    1008  1009  1010    1011    1012    1013    1014  
img
.
TM 5-2410-241-23-2
0174
INSTALLATION CONTINUED
N OT E
Install electrical connectors and route harness as noted during removal.
6. Position connector (Figure 9, Item 3) and harness (Figure 9, Item 5) in instrument panel (Figure 9, Item 4).
7. Connect connector (Figure 9, Item 1) to connector (Figure 9, Item 3).
8. Install grommet (Figure 9, Item 6) on instrument panel (Figure 9, Item 4).
9. Install new tiedown strap (Figure 9, Item 2) on connector (Figure 9, Item 3).
Figure 9. Harness Connector.
0174
0174-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.