TM 5-2410-241-23-3
0211
INSTALLATION CONTINUED
11. Install 10 new O-rings (Figure 25, Item 4) on 10 hoses (Figure 25, Item 3).
N OT E
Install hoses as noted during removal.
12. Install 10 hoses (Figure 25, Item 3), 10 flanges (Figure 25, Item 1), 40 washers (Figure 25, Item 5), and bolts
(Figure 25, Item 6) on control valve (Figure 25, Item 2).
Figure 25. Control Valve Hoses.
0211