• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 24. Hoses and Lines.
Figure 26. Top Hose.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  233    234    235    236    237  238  239    240    241    242    243  
img
.
TM 5-2410-241-23-3
0211
INSTALLATION CONTINUED
11. Install 10 new O-rings (Figure 25, Item 4) on 10 hoses (Figure 25, Item 3).
N OT E
Install hoses as noted during removal.
12. Install 10 hoses (Figure 25, Item 3), 10 flanges (Figure 25, Item 1), 40 washers (Figure 25, Item 5), and bolts
(Figure 25, Item 6) on control valve (Figure 25, Item 2).
Figure 25. Control Valve Hoses.
0211
0211-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.