26
TM 5-2410-241-23-3
FIELD MAINTENANCE
-
VALVE BANK GP - TEST 4 SERVICE WITH WINCH
0
212
EFFECTIVITY NOTICE (WITH WINCH)
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
References
0
0
Bracket, Link (3/8 in.; 2,250 lb [1,000 kg]) (WP
0
0
Gloves, Rubber (S0208)
0
Equipment Condition
0
0
0
Machine parked (TM 5-2410-241-10)
0
Wrench, Torque, Click, Ratcheting, 3/8" Drive,
0
0
Hydraulic system drained (WP 0184)
Wrench, Torque, Dial, 3/8" Drive, 300 lb-in.
0
Drawing Required
0
0
Lifting Device (1,000-lb capacity)
0
0
Materials/Parts
Estimated Time to Complete
0
0
0
8.0 Hr
0
0
0
Cotter pin
0
O-ring (50)
0
0212-1