Figure 26. Top Hose.
Figure 1. Hose Removal from Valve Bank.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  235    236    237    238    239  240  241    242    243    244    245  
img
. . . . . . . . . . . . . . .
26
TM 5-2410-241-23-3
0212
FIELD MAINTENANCE
-
VALVE BANK GP - TEST 4 SERVICE WITH WINCH
0
212
EFFECTIVITY NOTICE (WITH WINCH)
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0302, Item 65)
References
0
0
Bracket, Link (3/8 in.; 2,250 lb [1,000 kg]) (WP
WP 0245
0302, Item 10)
0
0
WP 0295
Gloves, Rubber (S0208)
0
(WP 0302, Item 68)
Equipment Condition
0
0
Goggles (S0209) (WP 0302, Item 68)
0
Machine parked (TM 5-2410-241-10)
0
Wrench, Torque, Click, Ratcheting, 3/8" Drive,
Winch pilot valve removed (WP 0257)
75 lb-ft (WP 0302, Item 73)
0
0
Hydraulic system drained (WP 0184)
Wrench, Torque, Dial, 3/8" Drive, 300 lb-in.
0
(WP 0302, Item 74)
Drawing Required
0
0
Lifting Device (1,000-lb capacity)
0
TM 5-2410-241-24P, Figure 93, 94
0
Materials/Parts
Estimated Time to Complete
0
0
Cap Set, Protective (WP 0303, Item 4)
0
8.0 Hr
0
Rag, Wiping (WP 0303, Item 24)
0
Tag, Marker (WP 0303, Item 34)
0
Cotter pin
0
O-ring (50)
0
0212-1