32
TM 5-2410-241-23-3
FIELD MAINTENANCE INSTRUCTIONS
-
CONTROL MANIFOLD SERVICE
0
216
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation, Control Manifold Accumulator
Charge Pressure Test, Accumulator Charging
INITIAL SETUP
Personnel
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
References
0
0
0
0
Coupling, Hose (1/4" NPT, Internal Thread)
0
Equipment Condition
0
0
0
Machine parked (TM 5-2410-241-10)
0
Gauge, Pressure (Pilot), Dial Indicating
Hydraulic system pressure released
0
(WP 0186)
0
Hose Assembly; 6,000 psi (41, 500 kPa), 1/8-
Hydraulic system drained (WP 0184)
27-NPTF, 18 ft (549 cm) long
0
Drawing Required
0
0
Wrench, Combination, 1 5/8" (S0794)
0
0
Estimated Time to Complete
Materials/Parts
0
0
4.5 Hr
0
0
0
0
0
O-ring (22)
0
0216-1