• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Gasket.
Figure 11. Resistor Connection.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  328    329    330    331    332  333  334    335    336    337    338  
img
.
TM 5-2410-241-23-3
0219
BLOWER MOTOR INSTALLATION CONTINUED
N OT E
Install connectors as tagged in removal.
3. Install harness and connect blower motor connector (Figure 9, Item 7) to blower harness connector (Figure 9,
Item 6).
4. Install grommet (Figure 9, Item 1) in cover (Figure 9, Item 2).
5. Install blower harness connector (Figure 9, Item 6) through grommet (Figure 9, Item 1) in cover (Figure 9,
Item 2).
6. Install blower motor (Figure 9, Item 5), three plates (Figure 9, Item 4), and six bolts (Figure 9, Item 3)
on cover (Figure 9, Item 2).
7. Install resistor. Refer to Resistor Installation in this work package.
8. Install temperature switch. Refer to Temperature Switch Installation in this work package.
Figure 9. Blower Motor Cover.
0219
END OF TASK
0219-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.